Light matters needing attention

 

1 and half an hour before the opening, open all equipment, low temperature preheating, test all the equipment and lines at the same time. Low temperature state refers to a dim light can;

 

2, warmed up after fifteen minutes to zero in all equipment, equipment cooling, cooling time not less than 15 minutes;

 

3, after cooling, can be formally entered the stage of music performance;

 

4, the performance, after the guests leave, lighting engineer should shut down all equipment, and make the equipment cooling 15 to 20 minutes, then equipment for storage or mask, juicers before departure.

 

Lighting equipment maintenance is more complicated than the level of sound, is trivial, basically do daily routine detection, regular weekly, monthly equipment maintenance and debugging appropriately;

 

Conventional detection range includes:

 

1, whether or not the bulb light properly;

 

2, all the devices of attachment is normal;

 

3, all the equipment whether can normal use, including light switch, color changer control, motion and so on is normal,

 

4, DMX512 signal whether can normal control lamps and lanterns;

 

5, special equipment is normal use, and fill them with the required materials, such as: machine, fog machine, snow machine, bubble machine, etc.

 

Regular testing

 

Regular testing in addition to routine monitoring all project also note the following points

 

1, in the weeks to detect when the connection to the main test equipment, including power cords, DMX512 cords, etc., and see whether there is loose, whether there is a breakpoint, etc.

 

2, when tested for weeks at the same time, should be more fully adjust the lamp and DMX512 programming;

 

Monthly equipment maintenance and proper adjustment

 

An appropriate adjustment of the every month in addition to routine monitoring and testing of all work a week, it will be a very meticulous work, need to coordinate multiple departments, such as actors, band, weak current, security, cleaning, etc., at the same time in the month test, to complete the following work.

 

1, light adjustment; Because in use there will be a part of the lamp, the change of movement or guest area lead to light changes, so in each month for the adjustment of the equipotential, of course, also include DMX512 signal control amount;

 

2, the testing of mechanical equipment, including the amount of motor, the color changer, special equipment of nozzle, etc.

 

3, check all the lines. To detect whether there is a breakpoint, breakage, leakage, because some human factors is in use to avoid lines appear all sorts of unexpected circumstances, such as ferrous wire is breaking, often plug wire, or about breakpoints, occasionally because and beverage line leakage or short circuit, etc., so the test should be very careful. The weak current testing needed to cooperate to complete;

 

4, clean lamps and lanterns of internal and external dust and garbage. Light itself will have some rubbish in use, such as residue inside the lamp bulb explosion of garbage, or other foreign minister time teach, special effects in the audience area machinery easy to fall into some rubbish, such as ribbon bar, scales, drinks the residual liquid, and so on. So be scraped clean lamps and lanterns outside of garbage and sewage, and clear the trash inside the lamp, this link need cleaning to cooperate;

 

5, check all fire protection equipment. Lighting, audio circuits is one of the most concentrated in the type of work, high voltage into the weak current, relevant equipment, related wire more, so fire is a top priority in the lights work, in the monthly routine check, should cooperate with security department, for all fire protection facility, fire fighting equipment to conduct a comprehensive inspection, monitoring scope includes the normal degree of fire-fighting equipment, fire fighting equipment choice whether normal, whether in the warranty period, etc.

 

In addition to the daily monitoring, test every week, every month comprehensive inspection, lighting engineers must know about all of the equipment and the environment is very, do please timely treatment, so as to have the good visual environment at the same time there is enough security.

【Font:Big Middle Small】【Printing this page】 【Back】【Top】【Close
CONTACT US

Service Hotline: 18922706009   Whatsapp:+8618922706009

E-mail:wfw04@163.com
Addr.:No.2, Qinglong Dongyi Street, Dalongtou Village, Jianggao Town, Baiyun District, Guangzhou
Website: http://www.www.njhacker.com

SHARE
粵ICP備19113232號

友情鏈接

主站蜘蛛池模板: 久久五月精品中文字幕| 国产乱女乱子视频在线播放| 亚洲男女一区二区三区| 亚洲欧美另类国产| 99久在线精品99re6视频| 用电动玩具玩自己小视频| 强行扒开双腿猛烈进入| 午夜精品一区二区三区在线观看| 中文字幕人妻三级中文无码视频| 91短视频网站| 欧美黑人疯狂性受xxxxx喷水| 国语自产精品视频在线区| 亚洲色欲久久久综合网东京热| 9丨精品国产高清自在线看| 激情内射日本一区二区三区| 国内不卡一二三四区| 哒哒哒免费视频观看在线www| 久久99精品久久只有精品| 色天使色婷婷丁香久久综合| 成年性午夜免费视频网站不卡| 向日葵视频app免费下载| 一本色道久久88加勒比—综合| 黄网站色视频大全免费观看| 泰国一级淫片免费看| 在线观看亚洲人成网站| 亚洲欧美乱综合图片区小说区 | 欧日韩在线不卡视频| 奇米影视7777久久精品| 人体内射精一区二区三区| 97人洗澡从澡人人爽人人模| 欧美性视频18~19| 国模精品一区二区三区视频| 亚洲欧美日韩精品在线| 手机在线看片你懂得| 日韩一区二区三区在线播放| 四虎国产精品免费久久久| yy22.tv夜月直播| 欧美日韩国产精品自在自线| 国产成人精品无缓存在线播放| 久久久久国产成人精品| 真正全免费视频a毛片|
Service
Service